This shows you the differences between two versions of the page.
Both sides previous revision Previous revision | Next revision Both sides next revision | ||
na:sustainability:tog:2023_01:tog-agenda-2023-01 [2022/12/07 08:45] ubach |
na:sustainability:tog:2023_01:tog-agenda-2023-01 [2022/12/07 11:00] ubach |
||
---|---|---|---|
Line 22: | Line 22: | ||
- **Stations** | - **Stations** | ||
* Any news from stations? (All) | * Any news from stations? (All) | ||
- | - **JIVE: eVLBI and operations** | + | * Discussion on eVLBI: 2 days, length of test time, mix with disk recording, towards 4 Gbps,... |
- | * Technical Operations and R&D at JIVE (Verkouter) | + | - **Improving EVN operations: developments at JIVE** |
* The centralized real-time EVN monitoring system (Keimpema) | * The centralized real-time EVN monitoring system (Keimpema) | ||
* Status of beam-map corrections for wide field imaging (Keimpema) | * Status of beam-map corrections for wide field imaging (Keimpema) | ||
* A new station-feedback tool (Small) | * A new station-feedback tool (Small) | ||
- | * Discussion on eVLBI: 2 days, length of test time, mix with disk recording, towards 4 Gbps,... | + | * Technical Operations and R&D at JIVE (Verkouter) |
---- | ---- |