User Tools

Site Tools


na:sustainability:tog:2023_01:tog-agenda-2023-01

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision Both sides next revision
na:sustainability:tog:2023_01:tog-agenda-2023-01 [2022/12/07 08:45]
ubach
na:sustainability:tog:2023_01:tog-agenda-2023-01 [2022/12/07 11:00]
ubach
Line 22: Line 22:
   - **Stations**   - **Stations**
       * Any news from stations? (All)       * Any news from stations? (All)
-  - **JIVE: ​eVLBI and operations** +      ​Discussion on eVLBI: 2 days, length of test time, mix with disk recording, towards 4 Gbps,... 
-      Technical Operations and R&​D ​at JIVE (Verkouter)+  ​- ​**Improving EVN operations: developments ​at JIVE**
       * The centralized real-time EVN monitoring system (Keimpema)       * The centralized real-time EVN monitoring system (Keimpema)
       * Status of beam-map corrections for wide field imaging (Keimpema)       * Status of beam-map corrections for wide field imaging (Keimpema)
       * A new station-feedback tool (Small)       * A new station-feedback tool (Small)
-      * Discussion on eVLBI: 2 days, length of test time, mix with disk recording, towards 4 Gbps,...+      * Technical Operations and R&D at JIVE (Verkouter)
  
 ---- ----
na/sustainability/tog/2023_01/tog-agenda-2023-01.txt · Last modified: 2023/01/30 15:30 by ubach