This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision Next revision Both sides next revision | ||
na:sustainability:tog:2023_01:tog-agenda-2023-01 [2022/12/07 08:38] ubach |
na:sustainability:tog:2023_01:tog-agenda-2023-01 [2022/12/15 09:50] ubach |
||
---|---|---|---|
Line 1: | Line 1: | ||
- | ===== TOG - Agenda, Jan. 24, 2023 (Draft 28.11.2022) ===== | + | ===== TOG - Agenda, Jan. 24, 2023 (Draft 9.12.2022) ===== |
Meeting start 9:30 CET (8:30 UTC), | Meeting start 9:30 CET (8:30 UTC), | ||
Line 17: | Line 17: | ||
* Anything to report about backends, recorders, receivers? (all) | * Anything to report about backends, recorders, receivers? (all) | ||
* Late arrival for schedules (Bach, all). | * Late arrival for schedules (Bach, all). | ||
+ | * Security issues with the vlbeer server (Bach/Stagni). | ||
- **Recorders: Mark 5, Mark6, Flexbuf ** | - **Recorders: Mark 5, Mark6, Flexbuf ** | ||
* Disk inventory and purchase status, 500 TB per stations + 500 TB at JIVE (Bach, all) | * Disk inventory and purchase status, 500 TB per stations + 500 TB at JIVE (Bach, all) | ||
+ | * Discussion about disk space management: "automatically" collect available disk space from flexbuff. (Jang) | ||
+ | * Discussion on naming conventions for multiple files from multiple threads. (Eldering/Bach, all) | ||
- **Stations** | - **Stations** | ||
* Any news from stations? (All) | * Any news from stations? (All) | ||
- | - **JIVE: eVLBI and operations** | + | * Discussion on eVLBI: 2 days, length of test time, mix with disk recording, towards 4 Gbps,... |
- | * Technical Operations and R&D at JIVE (Verkouter) | + | - **Improving EVN operations: developments at JIVE** |
* The centralized real-time EVN monitoring system (Keimpema) | * The centralized real-time EVN monitoring system (Keimpema) | ||
* Status of beam-map corrections for wide field imaging (Keimpema) | * Status of beam-map corrections for wide field imaging (Keimpema) | ||
* A new station-feedback tool (Small) | * A new station-feedback tool (Small) | ||
- | * Towards 4 Gbps eVLBI (discussion) | + | * New techniques to schedule observations. (Eldering) |
+ | * Technical Operations and R&D at JIVE (Verkouter) | ||
---- | ---- | ||
- | Lunch break about 13:00-14:30 CET. | + | Lunch break about 13:00-14:30 CET (if this is going to happen really at that point of the agenda depends on our progress). |
---- | ---- | ||