User Tools

Site Tools


na:sustainability:tog:2023_01:tog-agenda-2023-01

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
Next revision Both sides next revision
na:sustainability:tog:2023_01:tog-agenda-2023-01 [2022/12/01 11:42]
ubach
na:sustainability:tog:2023_01:tog-agenda-2023-01 [2022/12/07 08:38]
ubach
Line 21: Line 21:
   - **Stations**   - **Stations**
       * Any news from stations? (All)       * Any news from stations? (All)
-      * The centralized real-time EVN monitoring system (Bach, all) 
   - **JIVE: eVLBI and operations**   - **JIVE: eVLBI and operations**
       * Technical Operations and R&D at JIVE (Verkouter)       * Technical Operations and R&D at JIVE (Verkouter)
 +      * The centralized real-time EVN monitoring system (Keimpema)
 +      * Status of beam-map corrections for wide field imaging (Keimpema)
 +      * A new station-feedback tool (Small)
       * Towards 4 Gbps eVLBI (discussion)       * Towards 4 Gbps eVLBI (discussion)
-      * Discussion about new station-feedback tool 
-  - ** Technical Developments ** 
-     * DBBC2/DBBC3 Updates 
-     * Update on the BRAND receiver 
-     * ... 
  
 ---- ----
Line 35: Line 32:
 ---- ----
  
-  - ** Technical Developments ​(continued) ​**+  - ** Technical Developments ** 
 +     * DBBC2/DBBC3 Updates 
 +     * Update on the BRAND receiver
      * Triple-Band receivers: Status of development and plans for operation.      * Triple-Band receivers: Status of development and plans for operation.
 +     * ...
   - **Field System, status and new features **   - **Field System, status and new features **
       * Status and new developments (Himwich?)       * Status and new developments (Himwich?)
na/sustainability/tog/2023_01/tog-agenda-2023-01.txt · Last modified: 2023/01/30 15:30 by ubach