This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision Next revision Both sides next revision | ||
na:sustainability:tog:2020_05:tog-agenda-2020-05 [2020/04/20 11:12] ubach |
na:sustainability:tog:2020_05:tog-agenda-2020-05 [2020/05/04 10:07] ubach |
||
---|---|---|---|
Line 1: | Line 1: | ||
===== TOG - Agenda, May 5, 2020 ===== | ===== TOG - Agenda, May 5, 2020 ===== | ||
- | Meeting start 9:30. | + | Meeting start 9:30 (7:30 UT). |
- **Opening Remarks (Bach)** | - **Opening Remarks (Bach)** | ||
Line 9: | Line 9: | ||
- **Review of Permanent Action Items (all; see [[https://deki.mpifr-bonn.mpg.de/Working_Groups/EVN_TOG/Permanent_Action_Items| Permanent Action Items]])** | - **Review of Permanent Action Items (all; see [[https://deki.mpifr-bonn.mpg.de/Working_Groups/EVN_TOG/Permanent_Action_Items| Permanent Action Items]])** | ||
- **Reliability/Performance of the EVN ** | - **Reliability/Performance of the EVN ** | ||
- | * Reliability/Performance of the EVN. () | + | * Reliability/Performance of the EVN. (JIVE support scientistc) |
- | * NME results () | + | * NME results (JIVE support scientist) |
- | * Feedback from last sessions. () | + | * Feedback from last sessions. (JIVE support scientist) |
- | * Amplitude calibration. () | + | * Amplitude calibration. (JIVE support scientist) |
- **Amplitude Calibration ** | - **Amplitude Calibration ** | ||
* Review of continuous cal at the stations (Bach) | * Review of continuous cal at the stations (Bach) | ||
Line 27: | Line 27: | ||
* Any news? (All) | * Any news? (All) | ||
* Availability for EVN Session II? (All) | * Availability for EVN Session II? (All) | ||
+ | * New stations: ROT-54 (Sargsyan), RT-32 Zolochev (Ulyanov). | ||
- **eVLBI** | - **eVLBI** | ||
* Current status, new stations, 2 Gbps, ... | * Current status, new stations, 2 Gbps, ... | ||
Line 33: | Line 34: | ||
- ** Technical Developments ** | - ** Technical Developments ** | ||
* Report on higher incremental recording rates up to 32 Gbps (Bach). | * Report on higher incremental recording rates up to 32 Gbps (Bach). | ||
- | * DBBC3. Current status. Backwards compatibility and available firmware () | + | * DBBC3. Current status. Backwards compatibility and available firmware (Tuccari) |
- | * BRAND receiver () | + | * BRAND receiver (Alef) |
* Available IF bandwidth at all bands, receiver developments (Bach) | * Available IF bandwidth at all bands, receiver developments (Bach) | ||
* Auxiliary scripts & central repository (Bach) | * Auxiliary scripts & central repository (Bach) | ||
- **Field System, status and new features ** | - **Field System, status and new features ** | ||
- | * Status report, new developments (Himwich) | + | * Status and new developments (Ed) |
* Next Generation Field System (all) | * Next Generation Field System (all) | ||
- **Date and place of the next TOG meeting ** | - **Date and place of the next TOG meeting ** | ||
- | * To be decided | + | * Bonn in November, after session 3? |
- **AOB ** | - **AOB ** | ||
+ | |||
+ | End about 12:30 CEST (10:30 UT) | ||
+ | |||
+ | Session with NRAO, start at 15 CEST (13 UT) for about an hour | ||
+ | |||
+ | - ** VLBA, GMVA and Globals ** | ||
+ | * VLBA status and high frequency updates | ||
+ | * EVN status | ||
+ | * GMVA status | ||