This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision Next revision Both sides next revision | ||
na:sustainability:tog:2020_05:tog-agenda-2020-05 [2020/04/17 10:54] ubach |
na:sustainability:tog:2020_05:tog-agenda-2020-05 [2020/04/28 16:35] ubach |
||
---|---|---|---|
Line 9: | Line 9: | ||
- **Review of Permanent Action Items (all; see [[https://deki.mpifr-bonn.mpg.de/Working_Groups/EVN_TOG/Permanent_Action_Items| Permanent Action Items]])** | - **Review of Permanent Action Items (all; see [[https://deki.mpifr-bonn.mpg.de/Working_Groups/EVN_TOG/Permanent_Action_Items| Permanent Action Items]])** | ||
- **Reliability/Performance of the EVN ** | - **Reliability/Performance of the EVN ** | ||
- | * Reliability/Performance of the EVN. () | + | * Reliability/Performance of the EVN. (JIVE support scientistc) |
- | * NME results () | + | * NME results (JIVE support scientist) |
- | * Feedback from last sessions. () | + | * Feedback from last sessions. (JIVE support scientist) |
- | * Amplitude calibration. () | + | * Amplitude calibration. (JIVE support scientist) |
- **Amplitude Calibration ** | - **Amplitude Calibration ** | ||
* Review of continuous cal at the stations (Bach) | * Review of continuous cal at the stations (Bach) | ||
Line 30: | Line 30: | ||
* Current status, new stations, 2 Gbps, ... | * Current status, new stations, 2 Gbps, ... | ||
- **JIVE ** | - **JIVE ** | ||
- | * Technical Operations and R&D at JIVE, () | + | * Technical Operations and R&D at JIVE, (Verkouter) |
- ** Technical Developments ** | - ** Technical Developments ** | ||
* Report on higher incremental recording rates up to 32 Gbps (Bach). | * Report on higher incremental recording rates up to 32 Gbps (Bach). | ||
Line 38: | Line 38: | ||
* Auxiliary scripts & central repository (Bach) | * Auxiliary scripts & central repository (Bach) | ||
- **Field System, status and new features ** | - **Field System, status and new features ** | ||
- | * Status report, new developments (Himwich) | + | * Status and new developments (Ed) |
* Next Generation Field System (all) | * Next Generation Field System (all) | ||
- **Date and place of the next TOG meeting ** | - **Date and place of the next TOG meeting ** | ||
- | * To be decided | + | * Bonn in November, after session 3? |
- **AOB ** | - **AOB ** | ||