This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision Next revision Both sides next revision | ||
jra:rings [2017/03/14 14:51] irottmann [Deliverables] |
jra:rings [2017/07/04 13:46] jcasado [Deliverables] |
||
---|---|---|---|
Line 1: | Line 1: | ||
===== WP7 JRA RINGS ====== | ===== WP7 JRA RINGS ====== | ||
- | The main objective for RINGS (Radio Interferometry Next Generation Software) is to deliver advanced calibration algorithms for the next generation of radio astronomy facilities, characterized by a high sensitivity, a high bandwidth and long baselines ({{:jra:730562_radionet_wp7.pdf|RINGS Description}}). | + | The main objective for RINGS (Radio Interferometry Next Generation Software) is to deliver advanced calibration algorithms for the next generation of radio astronomy facilities, characterized by a high sensitivity, a high bandwidth and long baselines {{:jra:730562_radionet_wp7.pdf|RINGS}}({{:jra:730562_radionet_wp7.pdf|RINGS Description}}). |
**The RINGS parter:** MPG, ASTRON, JIV-ERIC, UMAN, OSO, DIAS | **The RINGS parter:** MPG, ASTRON, JIV-ERIC, UMAN, OSO, DIAS | ||
Line 17: | Line 17: | ||
* 9 January 2017, Dwingeloo/NL - [[https://events.mpifr-bonn.mpg.de/indico/event/26/|RINGS Kick off]] | * 9 January 2017, Dwingeloo/NL - [[https://events.mpifr-bonn.mpg.de/indico/event/26/|RINGS Kick off]] | ||
+ | * 20 April 2017, WP7.4 Telecon | ||
Line 24: | Line 25: | ||
^No^ Del. Title^Lead beneficairy^Type^Dissem. level^Due date^Subm. date^Document^ | ^No^ Del. Title^Lead beneficairy^Type^Dissem. level^Due date^Subm. date^Document^ | ||
- | |D7.1|Report State of the Art and Common Framework for Development|ASTRON|RE|Public|30.6.2017| | | | + | |D7.8|RINGS Final Report|ASTRON|RE|Public|30.06.2020| | | |
+ | |D7.7|Verification of RINGS software on BRAND dataset|MPG|OTH|Public|31.12.2019| | | | ||
+ | |D7.6|Final implementation of advanced calibration algorithms|OSO|OTH|Public|30.06.2019| | | | ||
+ | |D7.5|Final Implementation of algorithms for fringe fitting with dispersive delays|UMAN|OTH|Public|30.06.2019| | | | ||
+ | |D7.4|Final implementation of algorithms for multiband and wideband fringe fitting|JIV-ERIC|OTH|Public|30.06.2019| | | | ||
+ | |D7.3|Final implementation of algorithms for polarimetry conversion|OSO|OTH|Public|30.06.2019| | | | ||
|D7.2|Report on the strategies to combine results of first phase of tasks 7.2-7.5|ASTRON|RE|Public| 31.12.2018| | | | |D7.2|Report on the strategies to combine results of first phase of tasks 7.2-7.5|ASTRON|RE|Public| 31.12.2018| | | | ||
- | |D7.3|Final implementation of algorithms for polarimetry conversion|OSO|OTH|Public|30.06.2019| | | | + | |D7.1|Report State of the Art and Common Framework for Development|ASTRON|RE|Public|30.6.2017|30.6.2017 |{{:jra:730562_radionet-del7.1_170630.pdf|D7.1}} | |
- | |D7.4|Final implementation of algorithms for multiband and wideband fringe fitting|JIV-ERIC|OTH|Public|30.06.2019| | | | + | |
- | |D7.5|Final Implementation of algorithms for fringe fitting with dispersive delays|UMAN|OTH|Public|30.06.2019| | | | + | |
- | + | ||
- | |D7.6|Final implementation of advanced calibration algorithms|OSO|OTH|Public|30.06.2019| | | | + | |
- | |D7.7|Verification of RINGS software on BRAND dataset|MPG|OTH|Public|31.12.2019| | | | + | |
- | |D7.8|RINGS Final Report|ASTRON|RE|Public|30.06.2020| | | | + | |