User Tools

Site Tools


jra:rings

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Next revision
Previous revision
Next revision Both sides next revision
jra:rings [2017/03/14 14:36]
irottmann created
jra:rings [2017/03/14 14:44]
irottmann
Line 1: Line 1:
-===== WP6 JRA BRAND EVN ====== +===== WP7 JRA RINGS ====== 
-The main objective ​of BRAND EVN (BRoad bAND EVN) is to develop and build a prototype broad-band digital +The main objective ​for RINGS (Radio Interferometry Next Generation Software) is to deliver advanced calibration algorithms for the next generation of radio astronomy facilitiescharacterized by high sensitivity, a high bandwidth and long baselines ​({{:jra:730562_radionet_wp7.pdf|RINGS Description}}).
-receiverwhich will cover frequency range from 1.5 GHz to 15.5 GHz (1:10 rangechosen to include the 2 cm VLBA +
-band). The BRAND frontend can be adapted to different EVN antennas. The backend part can also be used for other +
-receivers with RF frequency or IF range between 0-16 GHz. ({{:jra:730562_radionet_wp6.pdf|BRAND EVN Description}}).+
  
-**The BRAND EVN parter:** MPG, ASTRON, ​INAFOSOUAH-IGNVUC+**The RINGS parter:** MPG, ASTRON, ​JIV-ERICUMANOSODIAS
  
-**The BRAND EVN tasks:** +**The RINGS tasks:** 
-  * WP6.1: Feasibility survey of EVN antennas ​[UAH, OSO, INAF+  * WP7.1 Methodology and approach ​[ASTRONUMAN OSO, JIV-ERIC, MPG, DIAS
-  * WP6.2: BRAND receiver frontend ​[MPG, INAF, OSO, UAH+  * WP7.2 Polarimetry Conversion ​[OSO, DIAS
-  * WP6.3: BRAND backend ​[INAFMPGASTRON, VUC+  * WP7.3: Multiband and Wide Band Fringe Fitting ​[JIV-ERICDIASMPG
-  * WP6.4: Control, recording and correlation software ​[INAFMPGOSOASTRON+  * WP7.4: Fringe Fitting with dispersive delays ​[UMANASTRONDIASMPG
-  * WP6.5: Integration at telescope and test observation ​[INAF, MPG, OSO, UAH+  * Task 7.5: Advanced calibration algorithms for full-polarization interferometry data [OSO, DIAS
- +  ​* ​ 
-This activity is lead by MPG - Leader ​WAlef.+This activity is lead by ASTRON ​- Leader ​GKruithof.
  
 ---- ----
-===== BRAND EVN Meetings =====+===== RINGS Meetings ​/ Teleconferences ​=====
  
   * 17-18 January 2017, Alcala/ES -  [[https://​events.mpifr-bonn.mpg.de/​indico/​event/​25/​|BRAND EVN Kick off]]    * 17-18 January 2017, Alcala/ES -  [[https://​events.mpifr-bonn.mpg.de/​indico/​event/​25/​|BRAND EVN Kick off]] 
  
-===== BRAND EVN Daily Management ===== 
- Is organised on:  
  
 ---- ----
 ===== Deliverables ===== ===== Deliverables =====
-The following deliverables are scheduled for WP6:+The following deliverables are scheduled for WP7:
  
 ^No^ Del. Title^Lead beneficairy^Type^Dissem. level^Due date^Subm. date^Document^ ^No^ Del. Title^Lead beneficairy^Type^Dissem. level^Due date^Subm. date^Document^
jra/rings.txt · Last modified: 2021/03/02 09:24 by jcasado